Disaster Data / States / Rhode Island / Providence County

County

Providence County, Rhode Island

Providence County recorded 17 federal disaster and emergency declarations since FY2000 (through FY2025): 9 major disasters, 8 emergencies, and 0 fire-management declarations. Its most common hazard is severe storm.

Highlighted: Providence County, RI

Totals: FY2000–FY2025 · Page last rebuilt Sep 12, 2026 · the current in-progress fiscal year is not included in totals

17
Declarations since FY2000
9
Major disasters (DR)
8
Emergencies (EM)
0
Fire management (FM)
Mar 2024
Most recent
$629.1M
Federal PA obligated (top: emergency protective measures)

The federal disaster record for Providence County runs between 2003 and 2024, covering 17 declarations in all. Its most recent major disaster declaration was Severe Storm And Flooding in 2024. The hazards behind these declarations were most often severe storm, hurricane, and snowstorm. Since 2000, FEMA has obligated about $629.1 million in Public Assistance funding to the jurisdiction, most of it for emergency protective measures.

Risk and vulnerability context

Historical declarations show what has happened here. These national datasets add context about underlying natural-hazard risk and community vulnerability.

County FIPS 44007
CDC / ATSDR

Social Vulnerability Index

2022 county-level SVI
81.0
overall percentile nationally

Approximately 81.0% of U.S. counties have an equal or lower overall SVI ranking.

Socioeconomic status67.9
Household characteristics59.4
Racial and ethnic minority status79.8
Housing type and transportation92.1

Higher percentiles indicate greater relative social vulnerability within the CDC SVI framework. CDC SVI documentation

FEMA

National Risk Index

December 2025
93.7
overall risk score
Relatively Moderate
Expected annual loss$129.5MRelatively Moderate
NRI social vulnerability53.0Relatively Moderate
Community resilience64.6Relatively High

The NRI combines expected annual loss, social vulnerability, and community resilience to describe relative natural-hazard risk. FEMA NRI documentation

About these measures: CDC Social Vulnerability Index and FEMA National Risk Index Social Vulnerability are separate measures built with different methods. They are shown side by side for context and should not be interpreted as equivalent scores.

Federal Public Assistance by category

Federal share obligated to this jurisdiction under FEMA Public Assistance since 2000, grouped by damage category. Figures are rounded to the nearest dollar and reflect obligations, which may change as projects close out.

CategoryProjectsFederal share obligated
Emergency protective measures(B)803$595,153,562
Management costs(Z)34$24,012,796
Debris removal(A)41$4,613,695
Roads and bridges(C)106$2,788,104
Utilities(F)16$1,045,018
Buildings and equipment(E)77$787,585
Parks and recreation(G)23$623,208
Water control facilities(D)3$58,614
All categories1,103$629,082,582

Recovery funding, how fast it came

For each disaster, the wait from the declaration to the first federal obligation (amber), then the federal share obligating after that (teal), on a shared 7-year scale. Typical wait to the first obligation here: about 115 days. An obligation is the federal share committed to the recipient state, not funds disbursed to the locality, which comes later and is not shown.

Severe Storms And Flooding 2024$655K
229 days to first federal obligation
Severe Winter Storm And Snowstorm 2022$3.4M
113 days to first federal obligation
Covid-19 Pandemic 2020$604.0M
133 days to first federal obligation
Severe Winter Storm And Snowstorm 2015$3.4M
118 days to first federal obligation
Severe Winter Storm And Snowstorm 2013$2.8M
102 days to first federal obligation
Tropical Storm Irene 2011$5.1M
47 days to first federal obligation
Declared1 yr2 yr3 yr4 yr5 yr6 yr7 yr

Hazard mitigation, what has been funded here

Federal Hazard Mitigation Assistance obligated to this jurisdiction to reduce future disaster losses, across the FEMA mitigation programs. This is the record of past mitigation investment a local hazard mitigation plan documents. Figures are federal share obligated, reported through OpenFEMA and not audited, and are separate from the Public Assistance funding above.

$4,350,316
federal mitigation share
50
funded projects
8
properties mitigated
ProgramProjectsFederal share obligated
Hazard Mitigation Grant Program(HMGP)24$2,201,097
Legislative Pre-Disaster Mitigation(LPDM)3$1,122,738
Pre-Disaster Mitigation(PDM)15$721,492
Building Resilient Infrastructure and Communities(BRIC)4$159,740
Flood Mitigation Assistance(FMA)4$145,250

State declarations (governor)

Emergency declarations issued by the governor of this state, which are separate from and usually precede a federal declaration. A declaration is listed here when NOAA Storm Events recorded reports of the matched hazard in this jurisdiction while the order was in effect. That is evidence of local impact during a declared state emergency. It is not a statement that the governor named this jurisdiction in the order, since most state declarations apply statewide and name no localities at all. Hazard categories come from the order text. Damage figures are NOAA storm report estimates for this jurisdiction only, not the cost of the declaration.

1
state declarations with local storm evidence
6
statewide on record

Archive coverage for Rhode Island: 2015-present structured Governor archive; State Library 1973-2014 backfill pending

Source: state executive order archives collected by DisasterData Plus, joined to NOAA Storm Events. See the Plus overview for per-state coverage and method.

Most common hazards

Previous occurrences, for your mitigation plan

Every local hazard mitigation plan must document previous occurrences of each hazard. Here is that record for Providence County, sourced to OpenFEMA and refreshed weekly. Copy it straight into your plan.

HazardDateFEMA declarationType
Severe StormMar 20, 2024DR-4765-RIDR
Severe StormMar 20, 2024DR-4766-RIDR
Severe StormJan 7, 2024DR-4753-RIDR
SnowstormMay 12, 2022DR-4653-RIDR
HurricaneAug 21, 2021EM-3563-RIEM
BiologicalMar 30, 2020DR-4505-RIDR
BiologicalMar 13, 2020EM-3440-RIEM
Severe StormApr 3, 2015DR-4212-RIDR
Severe StormMar 22, 2013DR-4107-RIDR
HurricaneOct 29, 2012EM-3355-RIEM
HurricaneSep 3, 2011DR-4027-RIDR
HurricaneAug 27, 2011EM-3334-RIEM
Severe StormMar 30, 2010EM-3311-RIEM
Severe StormMar 29, 2010DR-1894-RIDR
HurricaneSep 19, 2005EM-3255-RIEM
SnowstormFeb 17, 2005EM-3203-RIEM
SnowstormMar 27, 2003EM-3182-RIEM

Every declaration on record

DR = Major disaster (Stafford Act) · EM = Emergency declaration · FM = Fire management assistance

Showing 17 declarations

DateNumberTypeHazardTitle
Mar 20, 2024DR-4765-RIDRSevere StormSevere Storm And Flooding
Mar 20, 2024DR-4766-RIDRSevere StormSevere Storms And Flooding
Jan 7, 2024DR-4753-RIDRSevere StormSevere Storms, Flooding, And Tornadoes
May 12, 2022DR-4653-RIDRSnowstormSevere Winter Storm And Snowstorm
Aug 21, 2021EM-3563-RIEMHurricaneHurricane Henri
Mar 30, 2020DR-4505-RIDRBiologicalCovid-19 Pandemic
Mar 13, 2020EM-3440-RIEMBiologicalCovid-19
Apr 3, 2015DR-4212-RIDRSevere StormSevere Winter Storm And Snowstorm
Mar 22, 2013DR-4107-RIDRSevere StormSevere Winter Storm And Snowstorm
Oct 29, 2012EM-3355-RIEMHurricaneHurricane Sandy
Sep 3, 2011DR-4027-RIDRHurricaneTropical Storm Irene
Aug 27, 2011EM-3334-RIEMHurricaneHurricane Irene
Mar 30, 2010EM-3311-RIEMSevere StormSevere Storms And Flooding
Mar 29, 2010DR-1894-RIDRSevere StormSevere Storms And Flooding
Sep 19, 2005EM-3255-RIEMHurricaneHurricane Katrina Evacuation
Feb 17, 2005EM-3203-RIEMSnowstormRecord Snow
Mar 27, 2003EM-3182-RIEMSnowstormSnow
← Rhode Island statewide overview · All Rhode Island jurisdictions

How these numbers are built

Drawn from FEMA's OpenFEMA Disaster Declarations Summaries, rebuilt each week. A declaration is counted here once for each designated area it names, so a single disaster covering many localities is counted in each one. For that reason these jurisdiction counts do not sum to Rhode Island's statewide total. This page counts declarations that named this jurisdiction as a designated area. Totals cover complete fiscal years (Oct 1 to Sep 30); the in-progress year may appear in the most-recent list but is not counted in the totals. Uses OpenFEMA data but is not endorsed by or affiliated with FEMA.

Cite this profile

Choose a citation style, then copy the formatted citation. This profile is derived from FEMA OpenFEMA data and is updated as the underlying Disaster Data build is refreshed.

Other Rhode Island jurisdictions